EUR 1.85% 5.5¢ european lithium limited

I wonder if the current DFS includes the plant estimated costs...

  1. 439 Posts.
    lightbulb Created with Sketch. 210
    I wonder if the current DFS includes the plant estimated costs been built in Austria or Saudi Arabia?

    Fairly sure at this stage Austria....and the high Capex would indicate this.

    Maybe he can retain the high project NPV while bringing product price down, by cheaper plant capex in SA??

    If he manages this... then I can see CMC should fly on listing....

    Not even going to entertain the possibility of a plant in SA been able to process other mines ore also.....
    Last edited by thewhitekiwi: 13/01/23
 
watchlist Created with Sketch. Add EUR (ASX) to my watchlist
(20min delay)
Last
5.5¢
Change
0.001(1.85%)
Mkt cap ! $76.89M
Open High Low Value Volume
5.7¢ 5.7¢ 5.2¢ $65.10K 1.168M

Buyers (Bids)

No. Vol. Price($)
1 95467 5.5¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 71954 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
EUR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.