you guys are obviously not familiar with project construction and plant building. at 56% complete there is most concrete finished, steel being erected, u/g services being done, long lead items being stored in lay down yards, cranes swinging etc for these brine operations that are slow at forming plant feed the ponds would all need to be full and plenty of precipitation happening = bores pumping, trenches flowing and sumps full ........lots can be shown to us punters....agree with SEVO ...this smells a bit at the moment
- Forums
- ASX - By Stock
- KLL
- Ann: Non-Process Infrastructure Completed
Ann: Non-Process Infrastructure Completed, page-94
-
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable