PG,
Does the numbers then extrapolate out to 50 tonnes per month at $US23,300 per tonne = $US1,165,000 per month gross? Operating costs need to be extracted from that number, is that correct? Does anyone know their opex? If their opex is less than $US10,000 per tonne I'll be taking up my allocation for sure.
Thanks for your help.
Cheers,
Stumpy.
PG,Does the numbers then extrapolate out to 50 tonnes per month...
Add to My Watchlist
What is My Watchlist?