First things first. Even if just using the Smarts u/g reserves at face value ...
89,400 ounces. "Non-Renounceable Pro-Rata Entitlement Issuer Prospectus", Table 10, p. 51in USD ,000s Production Operating Costs 17,975 Site and Admin Costs 25,840 Processing Costs 24,876
Translates into roughly, = not inclusive of royalty, USD 768/oz cash costs.
It means 1. the project will be low-cost, payback very soon as it is only 2.5 years overall and 2. when upside is unlocked via much easier drill access in all directions from u/g even ore with 1/3 or 1/2 less grade could be economic.
TRY Price at posting:
3.0¢ Sentiment: None Disclosure: Held