FFM 2.47% 83.0¢ firefly metals ltd

Exactly, if you see a gap between the announcements and the...

  1. 309 Posts.
    lightbulb Created with Sketch. 60
    Exactly, if you see a gap between the announcements and the meterage drilled ~2,079m / 33days = ~63m / day. They completed 9 holes in that period with average hole length 2,079m / 9 = 231m. With 2 rigs on location with another one coming the frequency of the news will increase with number of meters drilled. Next couple of weeks should be exciting. Also Ray mentioned that 3rd rig will be exploring greenfield area / even more exciting..happy days!

    https://hotcopper.com.au/data/attachments/2307/2307876-9d3a2c0e6ea4864f6bf68adf82d45b6a.jpg

 
watchlist Created with Sketch. Add FFM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.