Another confusing factor is that the current drilling has stopped at 1891 metres, which is regarded as the FIRST target depth.
The full target depth when the well was commenced was 2100 metres, so, what is to happen with the remaining 209 metres, i.e. still a long way to go and what is there? Will they still sidetrack westward to get to that final target depth?
Still MANY questions to be answered and we can only hope that we continue to receive (understandable) updates, and soon.
- Forums
- ASX - By Stock
- Ann: North Maroon DW1 Drilling Update
Another confusing factor is that the current drilling has...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.608M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ICN (ASX) Chart |
Day chart unavailable