Glad someone else has read this horror story. The use of gas as a back is not a good read. We need to build 11 GW of new gas to firm the network. These will run 5% of the time. As an investment, say a 1GW gas turbine is a costly beast, how is the. owner going to get An ROI without significant standby payouts? These have been left out of the cost equation
- Forums
- ASX - By Stock
- RFX
- Ann: Notice to proceed for 15 MWh microgrid project in US
Ann: Notice to proceed for 15 MWh microgrid project in US, page-32
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.63M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
RFX (ASX) Chart |
Day chart unavailable