This is true! However in our Case the ASL lab work will also cost significantly less as we will not only do their prep lab work on site,but also save one more unnecessary shiping and handling cost from the ASL prep lab to Reno or Vancouver,so i assume the overal costs would still be still lower with our own prep lab than otherwise,but surelly the main reason for management to set up our own prelab was turn around time, by doing our own prep lab we most probably save at each drilling campaign a month or two.Considering at least 2 more drilling campaign before a BFS that would add together to a nice 3-4 month. Well done there!
- Forums
- ASX - By Stock
- Ann: Nova Commissions Prep Lab at The Estelle Gold Project
This is true! However in our Case the ASL lab work will also...
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.010(6.90%) |
Mkt cap ! $42.15M |
Open | High | Low | Value | Volume |
15.0¢ | 16.0¢ | 14.5¢ | $107.5K | 703.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 97305 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 161967 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 87305 | 0.155 |
8 | 340938 | 0.150 |
7 | 171594 | 0.145 |
6 | 180027 | 0.140 |
4 | 330248 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 161967 | 2 |
0.170 | 18380 | 2 |
0.175 | 33857 | 4 |
0.180 | 117642 | 1 |
0.190 | 33340 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |