It all depends on the specific local social, institutional and legal environment that the mine is in. Sometimes it takes very long like Donlin (10 years) but for Estelle it is expected to be a lot less lengthy.
Donlin on native title, federal and state land with wetlands - went full EIS particularly with their pipeline as well. We only on state land with limited to no wetlands so can go through possibly state EA - much faster.
CG thinks first gold in 2026. It will likely be a bit later IMO but again we don’t have difficult issues and easier regulatory as well.
- Forums
- ASX - By Stock
- NVA
- Ann: Nova Hits 78m @ 16.0 g/t Gold Within 258m @ 5.1g/t at RPM
Ann: Nova Hits 78m @ 16.0 g/t Gold Within 258m @ 5.1g/t at RPM, page-112
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.010(6.90%) |
Mkt cap ! $42.15M |
Open | High | Low | Value | Volume |
15.0¢ | 16.0¢ | 14.5¢ | $107.5K | 703.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 97305 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 161967 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 87305 | 0.155 |
6 | 319938 | 0.150 |
6 | 142874 | 0.145 |
6 | 180027 | 0.140 |
4 | 330248 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 150000 | 1 |
0.170 | 18380 | 2 |
0.175 | 33857 | 4 |
0.180 | 117642 | 1 |
0.190 | 33340 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
NVA (ASX) Chart |