NVA 2.50% 19.5¢ nova minerals limited

The idea is that a snow road is cheaper than flying everything...

  1. 5,715 Posts.
    lightbulb Created with Sketch. 1401
    The idea is that a snow road is cheaper than flying everything in. Though some things would still need to be flown in (ongoing fuel etc?).

    Problem being, the snow road scenario was not detailed in SS2 (so we don't know how the economics would compare for that scenario).

    It could still make sense using a snow road, but a smaller scale plant and mining plan for example.

    The road happening though should remove that scenario entirely though. Perfect.


    On Twitter, somebody keeps saying "WHY AREN'T YOU MINING YET?!".

    Well, PFS is not done. DFS is not done. I'll just leave this here -

    https://hotcopper.com.au/data/attachments/6011/6011953-40e37648273fdc46ad4d439debedaf62.jpg

    The screenshot is a bit old, but it shows that 2024 is meant to deliver both MRE and PFS.

    However, I think PFS could help the SP. There would be some larger investors willing to buy in after PFS, but not at SS2 stage (as risk reduces over time, as long as stages progress). That's ignoring the NPV factor, which could rise thanks to North Uphill (bit hard to predict with so many other factors in play though, including higher discount rate and inflation).
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
-0.005(2.50%)
Mkt cap ! $41.53M
Open High Low Value Volume
20.0¢ 20.3¢ 19.0¢ $23.14K 117.5K

Buyers (Bids)

No. Vol. Price($)
6 99613 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 18135 1
View Market Depth
Last trade - 15.34pm 05/06/2024 (20 minute delay) ?
Last
19.0¢
  Change
-0.005 ( 7.32 %)
Open High Low Volume
20.5¢ 20.5¢ 19.0¢ 23288
Last updated 15.26pm 05/06/2024 ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.