    The key element is completing the NI 43-101 Technical Report describing the resource.

    They've been working on it since March.


    Screen Shot 2018-07-30 at 7.30.22 pm.png

    Let's assume much of the background information has already been drafted and now the focus is on inserting the data for the Mineral Resource estimate. I think reasonable for 3-4 weeks for the full draft to be completed. Then allow 2-3 weeks for technical review and rework ( reasonable for a report of 200-300 pages). That to me would suggest this document might be ready in final publishable form sometime in September.

    Then there are all the regulatory filings required. This documentation could be prepared in parallel to the technical work above. Once documentation is ready, perhaps assume 1-2 months address comments from the TSX-V. I'm therefore thinking optimistic timeframe is October to November. Could push out into January if any comments as part of regulatory review are especially onerous.

    The standard for disclosure to TSX-V is here - this has all the rules about disclosure of technical information to the exchange.

    http://web.cim.org/standards/documents/Block484_Doc111.pdf

    From other 43-101s for emergent miners, it's reasonable to expect the Technical Report will be in the order of 200-300 pages. The report for Rock Tech Lithium is a good example:

    http://rocktechlithium.com/wp-conte...Technical-Report-with-Resource-Estimation.pdf

    The content and format requirements for the report are here.

    https://www.bcsc.bc.ca/Securities_Law/Policies/Policy4/PDF/43-101F1__F__June_24__2011/

    Here's the overview of the contents:

    CONTENTS OF THE TECHNICAL REPORT
    Title Page
    Date and Signature Page
    Table of Contents
    Illustrations

    Item 1: Summary
    Item 2: Introduction
    Item 3: Reliance on Other Experts
    Item 4: Property Description and Location
    Item 5: Accessibility, Climate, Local Resources, Infrastructure and Physiography
    Item 6: History
    Item 7: Geological Setting and Mineralization
    Item 8: Deposit Types
    Item 9: Exploration
    Item 10: Drilling
    Item 11: Sample Preparation, Analyses and Security
    Item 12: Data Verification
    Item 13: Mineral Processing and Metallurgical Testing
    Item 14: Mineral Resource Estimates
    Item 15: Mineral Reserve Estimates
    Item 16: Mining Methods
    Item 17: Recovery Methods
    Item 18: Project Infrastructure
    Item 19: Market Studies and Contracts
    Item 20: Environmental Studies, Permitting and Social or Community Impact
    Item 21: Capital and Operating Costs
    Item 22: Economic Analysis
    Item 23: Adjacent Properties
    Item 24: Other Relevant Data and Information
    Item 25: Interpretation and Conclusions
    Item 26: Recommendations
    Item 27: References


    There is a listing checklist here:

    https://www.tsx.com/resource/en/559/tsx-tsxv-checklist-en.pdf

    It's the roadshow period in Canada I'm looking forward to, which could be in the October to November timeframe based on my thoughts above. Would assume they have been doing some background marketing via the presentation released to market on 25 June. The roadshow will be critical for a successful IPO.
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
-0.005(3.70%)
Mkt cap ! $31.66M
Open High Low Value Volume
13.0¢ 15.0¢ 13.0¢ $24.17K 185.0K

Buyers (Bids)

No. Vol. Price($)
2 99999 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 30000 1
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.