GGX 0.00% 0.1¢ gas2grid limited

In early September 2019, we commenced drilling activities at the...

  1. 905 Posts.
    lightbulb Created with Sketch. 9
    In early September 2019, we commenced drilling activities at the Malolos Oil Field that initially
    include servicing the rig that is already on site at the Malolos-1 well and moving it by about 20
    metres to the Nuevo Malolos-1 well for the deepening drilling. Results can be expected towards the
    end of October 2019.

 
watchlist Created with Sketch. Add GGX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.