OK good point. They are planning on open pits. The issue seems to be financing such huge operations in a tight financial market and lack of an operating mill. Their capex is gong to be uuuuge. An interesting comparison is BGD which has an operating mill it's feeding in existing stockpiles from older mines, and largely self financing in a gold region in SA. They have large tenements there but SP is way lower than DEG. Tight register too.
- Forums
- ASX - By Stock
- DEG
- Ann: NVO: Significant drill results at Becher
Ann: NVO: Significant drill results at Becher, page-5
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.11 |
Change
0.020(1.83%) |
Mkt cap ! $2.660B |
Open | High | Low | Value | Volume |
$1.11 | $1.12 | $1.10 | $7.681M | 6.927M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 19649 | $1.11 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.12 | 123154 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 342511 | 1.105 |
17 | 259045 | 1.100 |
6 | 157377 | 1.095 |
20 | 176078 | 1.090 |
12 | 160674 | 1.085 |
Price($) | Vol. | No. |
---|---|---|
1.115 | 46632 | 4 |
1.120 | 469167 | 17 |
1.125 | 211459 | 11 |
1.130 | 263646 | 8 |
1.135 | 7669 | 3 |
Last trade - 16.10pm 06/06/2024 (20 minute delay) ? |
|
|||||
Last
$1.12 |
  |
Change
0.020 ( 1.79 %) |
|||
Open | High | Low | Volume | ||
$1.11 | $1.12 | $1.10 | 2176459 | ||
Last updated 15.59pm 06/06/2024 ? |
Featured News
DEG (ASX) Chart |