MEU 2.50% 3.9¢ marmota limited

Ann: NW Flank yields multiple outstanding gold intersections, page-22

  1. 3,802 Posts.
    lightbulb Created with Sketch. 1532
    OK. This system of heap leaching does it require environmental studies and such to be done onsite location ?
    Waste and or tailings dams built to secure waste disposal.
    Also the better recovery rate from mill compared to heap leaching would cover the costs of third parties ?
    Water is available all is at the Challenger Mill also existing licensing and Enviro studies probably waste disposal in the form of an existing tailing dam/holding facility. Infrastructure, power & probably camp accommodation all done just truck the ore. Same trucks that take it to the leaching facility just a longer journey to the ROM Pad at the process plant.
 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $42.37M
Open High Low Value Volume
4.0¢ 4.0¢ 3.9¢ $3.304K 84.40K

Buyers (Bids)

No. Vol. Price($)
1 144650 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 76225 1
View Market Depth
Last trade - 15.34pm 03/09/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.