It has been a long wait, and more wait to come as far as I can see. STX are likely to keep up the drilling momentum, and have demonstrated that they can get through DMIRS within a month or 2 of application. They are unlikely to be take an eternity on the 3D processing either. 2022 is most likely IMO for the MIN/NWE well unless another rig comes over and has free slots.
NWE Price at posting:
0.7¢ Sentiment: Hold Disclosure: Held