"In their opinion they both lean towards a vertical drills not sidetrack to tap straight into the structures and multiple drills at that to insure they tap into all plays.
I have been reminded that CH has not 1 but 6 taps drawing from that structure."
That would be expensive as would require a jack up type rig off shore , would it not be better to just do another side track with the rig based on the land , and perforate the drill stem where ever they think the most pay is , also potentially less environmental concerns ie if a blow out preventer failed its on at the well head on land not in the sea.
A little knowledge is dangerous and that is all I have , so welcome to be corrected .
- Forums
- ASX - By Stock
- Ann: NWE: Xanadu-1 Oil Discovery
"In their opinion they both lean towards a vertical drills not...
-
- There are more pages in this discussion • 316 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TEG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.320M |
Open | High | Low | Value | Volume |
0.4¢ | 0.5¢ | 0.4¢ | $51.09K | 12.74M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 13041614 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 6839612 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 13041614 | 0.004 |
43 | 48886596 | 0.003 |
17 | 30580000 | 0.002 |
10 | 28662817 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 6839612 | 18 |
0.006 | 9011951 | 9 |
0.007 | 2995000 | 5 |
0.008 | 5458186 | 7 |
0.009 | 2900305 | 6 |
Last trade - 15.18pm 27/09/2024 (20 minute delay) ? |
Featured News
TEG (ASX) Chart |