Last page of the presentation : "CETO 6 Australia grid connected project underway –construction commences 2016 at Garden Island".
Guess that construction means foundations / piles / whatever is planned and I suppose cabling etc.
Ceto 6 will possibly be launched at Garden Island during late 2016 / early 2017 before winter weather sets in? Time for testing in low sea conditions followed by heavier conditions during our early winter which is then coming into summer conditions in UK.