Results of a shift in power base with the Aus/NZ based management purged after the Wilkes era debacles and some new blood.
Running the money makings operations in the Aus/NZ & Philipines remotely & about 12 hours out of sync will be a challenge.
Haile is still far from settled in the groove and looks likely to disappoint for a long time. Waihi projects look likely to repeat the troubles at Haile