YAR 0.00% 0.4¢ yari minerals limited

Ann: October Investor Update, page-2

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    some info found in this presentation that might providing some missing links to the scoping study:

    * Targeting mining and concentrate production Q1 2018

    * Low capital requirements, fast payback and short lead time to production

    * Current plant is pilot scale – can be upgraded to 300tpd (110,000tpa) but a larger full scale operation requires a new concentrator.

    * Plant upgrade Estimated low capex to upgrade current plant – SRK Report.

    * (old info) Upgradeable to 200 tpd (75,000 tpa) – SRK due diligence report (US$1M)

    * +90% recoveries to concentrate

    * Existing plant onsite – Targeting: ~110ktpa for 20Kt of Zn concentrate pa

    * The metallurgical testwork indicates thatzinc recoveries of 90% to 95% could be obtained to produce a clean concentrate with contained grades of 55% Zn (from scoping study)

    * Estimated ~2020 New Standalone plant: Targeting ~250,000 tpa

    * Preliminary discussions with financing and off-take partners underway.

    * Operating costs Comparison & estimates suggest opex will be low (tbc).


    * Arena can elect to move to 80% of the Plomosas Project for an additional A$750,000 in cash + A$1,700,000 in shares

    * other 20% at EV value
    Last edited by ddzx: 01/11/17
 
watchlist Created with Sketch. Add YAR (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $1.929M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $100 25K

Buyers (Bids)

No. Vol. Price($)
15 5549979 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 5450240 9
View Market Depth
Last trade - 15.46pm 21/05/2024 (20 minute delay) ?
Last
0.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.5¢ 0.5¢ 0.5¢ 50000
Last updated 11.59am 21/05/2024 ?
YAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.