Interesting to look back at the Vali-1 ST1 extended well test in...

  1. 1,809 Posts.
    lightbulb Created with Sketch. 4677
    Interesting to look back at the Vali-1 ST1 extended well test in the Patchawarra and the early stages of the Odin-1 test. Apparent higher FWHP at Odin-1 but its early days.......

    August 2020: Vali-1 ST1 fracture stimulated Patchawarra Formation
    • Extended flow test program 4.3 MMscfd of gas was measured through a 36/64“choke at a flowing well-head pressure (“FWHP”) of 942 psi, two-day test period.
    • Transient tests;
    Rates recorded between 3.7 MMscfd (through a 24/64” choke at 1,676 psi (FWHP) and 7.5 MMscfd (through a 32/64” choke at 1,593 psi (FWHP)

    October 2021: Odin-1 unstimulated Toolachee, Epsilon Formations
    • Initial rate, 7.58 million cubic feet per day (MMscfd) through a variable choke set at 34/64” at 2018 psi FWHP and 46 Bwpd.

    Kind regards OldGeo
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $3.665M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
18 19285488 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 5913861 9
View Market Depth
Last trade - 16.12pm 20/06/2025 (20 minute delay) ?
MEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.