Surely not going to Murrin Murrin. It is not oxide ore and as such could be floated (economics?)
or much more likely heap leached. Murrin Murrin is oxide ore which requires expensive HPAL processing. Even if the plant were configured for sulphuric ores the trucking would kill the economics at 0.6%
- Forums
- ASX - By Stock
- Ann: Odysseus Mine Development Reaches First Ore
Surely not going to Murrin Murrin. It is not oxide ore and as...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WSA (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & MD
Charles Armstrong
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online