Key Points:
- Cosmos concentrator upgrades from 900ktpa to 1.1Mtpa allows production from AM6
- ODS massive sulphide drilling to commence this month
- The tender bids are extremly positive for ODS offtake
Add to My Watchlist
What is My Watchlist?