The original DFS was for a gravity fed process plant that produced a tantalum concentrate. The updated DFS adds a floatation circuit that extracts spodumene from the tailings produced by the gravity circuit. The funding and size of the two process circuits should be sized much larger than the abutting gravity plant. Am guesstimating A$30 to $50M required to proceed.
- Forums
- ASX - By Stock
- Ann: Off-take & funding LOI Swanson Tantalum/Lithium Project
The original DFS was for a gravity fed process plant that...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AM7 (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.960M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AM7 (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online