I’m well aware of the mining operation.
I’m guessing the panels were designed to minimise costs and have proven to be too steep, too narrow etc
So if you re designed for safety Im betting costs go thru the roof and it’s not profitable.
sure the stockpile will eventually get sold but it may not be part of this offer.
Rusk is whether they try to bring in another asset to pump the business back again. Hope not.
- Forums
- ASX - By Stock
- Ann: Offer Received
I’m well aware of the mining operation. I’m guessing the panels...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TI1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.208M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TI1 (ASX) Chart |
Day chart unavailable