Agree with you there Bizzo. Also all the material contractors dumped down the shaft when they were developing level 8 underground as old stopes are full and there was no stockples in any of their photos.
Before they can do anything though they need an Authority to Enter and Operate and I suspect even with the pro mining givernment ir would be a brave HDC, DOC or WRC to grant such in Greensides NZ without extensive investigation which means time and they dont have much of that given the 1.2M costs per annum.
On an interesting note Shortfall closed Friday.........
- Forums
- ASX - By Stock
- Ann: Ohinemuri River Discolouration
Agree with you there Bizzo. Also all the material contractors...
-
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.13M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 98418 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 12813 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 98418 | 0.019 |
1 | 250000 | 0.018 |
1 | 87523 | 0.016 |
1 | 90000 | 0.011 |
1 | 50000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 12813 | 1 |
0.022 | 149506 | 2 |
0.023 | 50259 | 2 |
0.025 | 25889 | 1 |
0.029 | 524324 | 1 |
Last trade - 11.57am 03/10/2024 (20 minute delay) ? |
Featured News
NTL (ASX) Chart |
Day chart unavailable