“The bulk sample was extracted at approximately 790-800m depth via access through the Bernterode shaft. The extraction area is located approximately 700m from the Ohmgebirge tenement boundary. The Hartsalz potash seam from which the sample was extracted is contiguous with the Ohmgebirge deposit.Testwork on the sample is now set to be carried out by industry leader K-UTEC, at its local Sondershausen laboratory in the South Harz mining district, and to report back by end of July. This testwork is planned to include grind size optimisation for leach recovery and backfill material design and engineering.”
- Forums
- ASX - By Stock
- SHP
- Ann: Ohmgebirge PFS on Time and on Budget
Ann: Ohmgebirge PFS on Time and on Budget, page-31
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SHP (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.441M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $10.44K | 1.044M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 251146 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 944212 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1337000 | 0.009 |
6 | 1472500 | 0.008 |
4 | 1100000 | 0.007 |
2 | 350000 | 0.006 |
2 | 380000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 944212 | 1 |
0.012 | 457586 | 2 |
0.013 | 388128 | 2 |
0.014 | 119999 | 1 |
0.015 | 1569436 | 1 |
Last trade - 14.53pm 08/11/2024 (20 minute delay) ? |
Featured News
SHP (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online