Only 6 weeks until the end of the quarter in which they tell us gold production will begin.
I reckon 2 weeks until some of the electrical equipment is being test run.
Function tests, rotation of mill, correct direction of rotation and operation of conveyor belts. All valves operated, any shut down systems tested.
Much can be carried out as they progress the construction.
If all is progressing as they say it is, then first gold optimistically in 4 weeks. Lets hope so.
- Forums
- ASX - By Stock
- Ann: Okvau Gold Project On Track For Commissioning 2Q21
Only 6 weeks until the end of the quarter in which they tell us...
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.22 |
Change
0.030(0.72%) |
Mkt cap ! $2.772B |
Open | High | Low | Value | Volume |
$4.18 | $4.22 | $4.15 | $4.461M | 1.063M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8689 | $4.21 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.22 | 18710 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8689 | 4.210 |
3 | 12416 | 4.200 |
1 | 22702 | 4.180 |
3 | 13342 | 4.170 |
1 | 8700 | 4.160 |
Price($) | Vol. | No. |
---|---|---|
4.220 | 18710 | 7 |
4.230 | 14166 | 3 |
4.240 | 18794 | 1 |
4.250 | 16908 | 2 |
4.350 | 230 | 1 |
Last trade - 16.10pm 31/10/2024 (20 minute delay) ? |
Featured News
EMR (ASX) Chart |