Beanpea, would I be right in thinking that while they will probably get the mill turning in the stated timeline they won't actually be full steam ahead. I only say this as other startups I've seen usually run some low grade stuff through first then shut down to inspect the plant for nooks and crannies where the good stuff might be trapped and at the same time check the recovery rate to make sure money is not flowing down to the tailings pile.
Then they ramp up when they've got it right.
- Forums
- ASX - By Stock
- Ann: Okvau Gold Project On Track For Commissioning 2Q21
Beanpea, would I be right in thinking that while they will...
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.00 |
Change
0.030(0.76%) |
Mkt cap ! $2.627B |
Open | High | Low | Value | Volume |
$3.96 | $4.00 | $3.91 | $4.322M | 1.087M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 11049 | $3.97 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.00 | 240865 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1050 | 3.970 |
1 | 1050 | 3.960 |
1 | 1050 | 3.950 |
1 | 1050 | 3.940 |
2 | 3239 | 3.930 |
Price($) | Vol. | No. |
---|---|---|
4.000 | 113388 | 1 |
4.020 | 9940 | 1 |
4.030 | 1050 | 1 |
4.040 | 5032 | 2 |
4.050 | 14032 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
EMR (ASX) Chart |