Pretty disappointing.
The Sept 2018 resource was 24.6Mt @ 1.4g/t for 1.1Moz
Now this update, although more material is indicated, has decreased to 23.2Mt @ 1.3g/t for 1.0Moz.
So multiple rigs drilling for an extra year managed to only cut the grade, with a minor conversion to indicated.
Good work team!
- Forums
- ASX - By Stock
- BRB
- Ann: On track for significant new open pit mine
Ann: On track for significant new open pit mine, page-5
-
-
- There are more pages in this discussion • 209 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)