CKA 1.11% 9.1¢ cokal limited

Ann: Operation Update, page-21

  1. 859 Posts.
    lightbulb Created with Sketch. 300
    12th Feb. - 31mm at Muara Teweh and in highland areas
    13th Feb. Pattern of works at Pit 3 has changed significantly since new contractors started (base 1st clearer image 23 Jan)
    https://hotcopper.com.au/data/attachments/5954/5954748-cad048352bb9b5bb8861c1cb255c9282.jpg

    12th Batu Tuhup - river level has risen back to height where 800t barges from pit 3 have previously operated (compare my previous post) newer loading area partially filled (small cloud obscures part - see prior posts for comparisons: especially last gif) - unclear if 4000t barges can load at this point. No change in coal pile perimeters visible over last 7 days.
    https://hotcopper.com.au/data/attachments/5954/5954751-b9879dd4754aae52146c6abbb4655997.jpg
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
9.1¢
Change
0.001(1.11%)
Mkt cap ! $98.18M
Open High Low Value Volume
9.0¢ 9.4¢ 8.8¢ $94.00K 1.039M

Buyers (Bids)

No. Vol. Price($)
4 123957 9.1¢
 

Sellers (Offers)

Price($) Vol. No.
9.4¢ 31904 1
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.