The conveyer loader, jetty, weighbridge are being constructed. Some of this was set for Jan completion. Weigbridge based on recent updates is around 70% complete. If you were a customer coming to pick up coal, its surely is easier once the jetty and conveyor belt are in operation would it not? Maybe im grasping at straws but if there is no immediate urgency from a customer point of view, waiting for the infrastructure to be in place is surely easier and safer with load weight more accurate?
- Forums
- ASX - By Stock
- Ann: Operation Update
The conveyer loader, jetty, weighbridge are being constructed....
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
-0.003(3.70%) |
Mkt cap ! $84.15M |
Open | High | Low | Value | Volume |
8.4¢ | 8.4¢ | 7.8¢ | $21.83K | 265.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 124169 | 7.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 6337 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 124169 | 0.078 |
1 | 8700 | 0.077 |
1 | 40000 | 0.075 |
1 | 10000 | 0.074 |
1 | 140690 | 0.071 |
Price($) | Vol. | No. |
---|---|---|
0.085 | 6337 | 1 |
0.087 | 29995 | 1 |
0.090 | 100000 | 1 |
0.091 | 100000 | 1 |
0.092 | 108000 | 1 |
Last trade - 16.10pm 23/08/2024 (20 minute delay) ? |
CKA (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online