ROOSEVELT PROJECT
Australia II 12KA 6, #1-29H, (SSN 100%)
A work over rig was moved onto the well July 16th to re-establish production. Rods were parted at the top of the pump. Tubing was pulled to retrieve the pump. Tubing, rods, and a new pump were run back in hole, and the well was put on production July 18th. Since then, the well has flowed 317
bbls oil at a rate of 159 BOPD.
- Forums
- ASX - By Stock
- Ann: Operational Advisory
ROOSEVELT PROJECT Australia II 12KA 6, #1-29H, (SSN 100%) A work...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SSN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online