ROOSEVELT PROJECT
Australia II 12KA 6, #1-29H, (SSN 100%)
A work over rig was moved onto the well July 16th to re-establish production. Rods were parted at the top of the pump. Tubing was pulled to retrieve the pump. Tubing, rods, and a new pump were run back in hole, and the well was put on production July 18th. Since then, the well has flowed 317
bbls oil at a rate of 159 BOPD.