No, NO and NO WAY. But that's just IMO.
You just don't change a frac design on a "whim" - says its scheduled for Jan and the materials would have been sourced and contracted some time ago I would say.
Let's just say for a second that it was feasible i.e. commercializing the N2 from Bluff and using nitrogen as the basis for potential future fraccing in SSN wells - you would need to revisit the whole frac design and whether the geology is suited. AFAIK, not all fracs (proppants, stages, pressure, etc) designs work in all places.
IMO - way to early - but great for HC chatter.
- Forums
- ASX - By Stock
- SSN
- Ann: Operational Advisory
Ann: Operational Advisory, page-26
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)