SYA 4.76% 4.4¢ sayona mining limited

Ann: Operational Review to Optimise NAL Cost Structure, page-175

  1. 4,380 Posts.
    lightbulb Created with Sketch. 8112
    This has nothing to do with exploration, this is the cost that it takes to produce the product. PLL would owe 25% of any costs associated with running NAL.
    https://hotcopper.com.au/data/attachments/5914/5914459-d34d45eb919c6458c429265151804252.jpg

    I would expect these costs to be severely curtailed or eliminated. They still need to complete the crushed ore dome, so they may do a bit more to at least get it ready for next winter.
    https://hotcopper.com.au/data/attachments/5914/5914464-81056d3d310b6175af418337073bf858.jpg


 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.002(4.76%)
Mkt cap ! $452.9M
Open High Low Value Volume
4.5¢ 4.6¢ 4.4¢ $2.827M 63.17M

Buyers (Bids)

No. Vol. Price($)
11 4417732 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 3155048 18
View Market Depth
Last trade - 16.10pm 27/05/2024 (20 minute delay) ?
Last
4.4¢
  Change
0.002 ( 4.27 %)
Open High Low Volume
4.5¢ 4.6¢ 4.4¢ 28349538
Last updated 15.59pm 27/05/2024 ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.