some big boys at play with essar onboard now. all critical infrastructure in place already, being power etc... this one is construction for positioning of new plant, retrofitting phase two and the install of phase three... then commissioning...mineralogy wise they have learnt a hell of a lot from phase two, so commissioning should be nowhere near the drama and time (or testing) as phase two.
of course, fingers crossed....
- Forums
- ASX - By Stock
- Ann: Operational Update Phase 3 Acceleration
some big boys at play with essar onboard now. all critical...
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online