88E 0.00% 0.2¢ 88 energy limited

Ann: Operational Update - Significant Progress on all Fronts-88E.AX, page-164

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 7,487 Posts.
    lightbulb Created with Sketch. 99
    Domum
    We all know that horizontal drilling can be up to 4miles long, I was wondering about the IC#2 drill location, in that, if it is located on the IC#1 drill site the maximum horizontal drill length, North or West would only be about 1mile, as beyond that it is not apart of 88E lease, due to the stepped/interlocked pattern of the leases..
    To me that seems to suggest that the direction of the drilling can only be in an arc approx. Southeast to West, or the horizontal lengths will be fairly short.
    Am I seeing this correct?
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $1.039K 519.6K

Buyers (Bids)

No. Vol. Price($)
363 994625227 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 101395656 19
View Market Depth
Last trade - 09.59am 13/11/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.