OBM 4.23% 37.0¢ ora banda mining ltd

1. Has the milling operation been running at all? 2. The gold in...

  1. 26 Posts.
    lightbulb Created with Sketch. 8
    1. Has the milling operation been running at all?
    2. The gold in circuit is limited to whats in the leach and adsorption tanks, unless it is on loaded carbon which is out of the inventory of the current circuit.
    3. Any GIC should have already been recovered from the 22nd Aug.
    4. It would have been nice if they bothered to tell the market they are processing as no one seems to know.
    5. Now they have no mining.
    6. Assuming they have ROM stocks are are processing, this is likely to only hold low grade ore from open pit, and smaller stockpile of high grade ore from underground. It is not likely to be excessive in tonnage.
    7. Any gold in the mill will stay there unless you plan on trying to recover it from between mill liners and in which case it won't be a lot.


    (From 22 Aug Press Release) Processing operations have been temporarily suspended and open-pit and haulage contractors placed on standby pending the recommencement of processing operations. The gold room circuit and underground mining operations will continue to operate.
 
watchlist Created with Sketch. Add OBM (ASX) to my watchlist
(20min delay)
Last
37.0¢
Change
0.015(4.23%)
Mkt cap ! $686.9M
Open High Low Value Volume
36.0¢ 38.0¢ 35.5¢ $1.241M 3.355M

Buyers (Bids)

No. Vol. Price($)
1 11698 37.0¢
 

Sellers (Offers)

Price($) Vol. No.
38.0¢ 35224 5
View Market Depth
Last trade - 16.10pm 20/06/2024 (20 minute delay) ?
OBM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.