GSR greenstone resources limited

Ann: Operational Update, page-2

  1. FGB
    1,450 Posts.
    lightbulb Created with Sketch. 95
    OPERATIONAL UPDATE
    ▪ Multipurpose Drill Rig Secured for Flagship Burbanks Project
    ▪ Experienced drilling contractor secured for 5,500m program;
    ▪ Multipurpose rig to be mobilised to site in early November;
    ▪ Ability to complete reverse circulation and diamond drilling.
    ▪ Phillips Find Drilling Yields High Grade Intercepts, Including:
    ▪ PFRC101: 17m @ 2.09g/t Au from 95 metres, including:
    ▪ 2.0m @ 8.93g/t Au from 110 meters.
    ▪ PFRC103: 8.0m @ 1.84g/t Au from 179 metres, including:
    ▪ 2.0m @ 3.26g/t Au from 183 metres.
    ▪ Program served to meet expenditure requirements.
    ▪ Burbanks Stage I Trial Mining Joint Venture (JV)
    ▪ Lateral development in ore and waste continues;
    ▪ 5,650t and 39,550t of ore and waste mined, respectively;
    ▪ Stoping expected to begin in mid-December 2021.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.