    Announcement check list- seems like it will be very delayed –a late May event? But should be comprehensive – with overall goal to define the area as a new & major hydrocarbon province (confirm initial commercial development plus regional potential). Totally speculative guesswork below but provides a framework of what to expect in a best-case scenario.

    1. 2025 Deal targets

    1. cash – for past costs etc > ka-ching!

    2. drill carry – for 3 wells in 2024 – possible contribution for 2025 - 3 wells

    3. Capex - carry phase 1 / possible carry phase 2?

    4. Share placement @ premium?

    5. Could structure deal at 25% equity for 2024 carry, ditto for 2025 option

    2. 2024 Sign up rig for 6 slots over 2 years

    1. big issue is performance- able to drill wells quickly

    2. Even bigger issue is completion and testing without screw ups - long history

    3. 2024 Preliminary drill program 3 wells

    1. 2 appraisal and 1 exploration

    2. Appraisal locations picked

    3. RAF#2 Crestal along strike - safe for 2C boost

    4. RAF#3 Second downdip to southwest

    5. Plus test existing well #1

    4. 2024 Exploration mapping done

    1. Massive U2 = 2++ TCFE

    2. 1 Exploration location drilled 2024

    3. Seismic 2024 - possible

    4. Acreage win announced

    5. RAF wild cards tested by RAF#3

    1. are there extra zones - above and below existing = much thicker reservoir?

    2. possible flat spot(s) indicating deep gas/ water and or oil leg?

    6. RAF Reserve estimates

    1. Core zones (after RAF#2 & test RAF#1) 2P + 2C = 1 TCFE

    2. After RAF#3:

    3. - Add extra reservoir zones (2C) = + .5 TCFE - down dip

    4. - Deep G/W (2C) add .5 TCFE

    5. - Possible oil leg in well 2 (U2 ) speculative (needs to be thick to be productive (avoid coning) but if present goes forever as is outside closure)

    6. So RAF total 2P&2C unrisked success case 2+ TCFE

    7. RAF Commercial plans for above

    1. Enough to support 330 mmcfd gas export project 20 years

    2. Third party infrastructure funding for gas processing plant

    3. Third party LNG exports plant

    4. Funky green solar ccs etc

    8. 2025 Preliminary program 2025 > drill three wells

    1. RAF#4 producer

    2. Exploration #1 appraisal

    3. Exploration #2 new feature

    2024 should have early resource update and booked reserves by YE.

    2025 should have dual FID – phase 1 and later phase 2. Additional upside from exploration and 2H IPO.

    Production not until 27/29.


 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
9.0¢
Change
0.001(1.12%)
Mkt cap ! $60.42M
Open High Low Value Volume
9.0¢ 9.2¢ 8.8¢ $49.16K 551.5K

Buyers (Bids)

No. Vol. Price($)
2 81072 8.8¢
 

Sellers (Offers)

Price($) Vol. No.
9.2¢ 91865 3
View Market Depth
Last trade - 15.48pm 07/06/2024 (20 minute delay) ?
Last
9.1¢
  Change
0.001 ( 2.25 %)
Open High Low Volume
9.0¢ 9.1¢ 8.9¢ 156758
Last updated 14.08pm 07/06/2024 ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.