Following the 2018 cyclone shut-in, U1/2 were restarted in early May, there was a 14/5 Ann that U4&5 (which had been drilled just before the shut-in) were now connected to the production system and were about to be placed on production and on 21st May, ROC farmed in. So if it’s going to happen, this is the time. Tom has multiple offers sitting in his in tray and the AGM is 2 weeks away if he doesn’t want a total shitshow.
- Forums
- ASX - By Stock
- Ann: Operational Update
Following the 2018 cyclone shut-in, U1/2 were restarted in early...
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRU (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
-0.002(2.13%) |
Mkt cap ! $61.76M |
Open | High | Low | Value | Volume |
9.2¢ | 9.2¢ | 9.1¢ | $9.764K | 106.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 19763 | 9.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.2¢ | 105000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 19763 | 0.091 |
5 | 72044 | 0.090 |
4 | 262000 | 0.089 |
3 | 140000 | 0.088 |
4 | 74475 | 0.087 |
Price($) | Vol. | No. |
---|---|---|
0.092 | 105000 | 1 |
0.093 | 70000 | 1 |
0.094 | 149969 | 3 |
0.095 | 50000 | 1 |
0.097 | 191913 | 3 |
Last trade - 15.48pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
9.2¢ |
  |
Change
-0.002 ( 1.08 %) |
|||
Open | High | Low | Volume | ||
9.3¢ | 9.3¢ | 9.1¢ | 94244 | ||
Last updated 15.48pm 04/06/2024 ? |
Featured News
BRU (ASX) Chart |