So when did they say they would pull out 470 odd tonnes? I remember they said they would produce 550 tonnes in 12 months, so far less than 3.6 tonnes in 3 months, to meet their 550 quoted tonnes they would need to produce 916 tonnes of 60 % concentrate and at lets say at best 1% tin for grade ( i think i calc 0.78 % for quarter) that means they would need to" pull out" more like 5500 tonnes of ore.They are a long way from that but yes blame it on the weather.
I reckon PW was so surpised that there was a banged up crusher at the local tip shop when he visited. Perfect timing.
Christopher
- Forums
- ASX - By Stock
- Ann: Operations and Development Update
So when did they say they would pull out 470 odd tonnes? I...
-
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add C7A (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.501M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $115 | 11.46K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1713070 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 488766 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1713070 | 0.009 |
3 | 573919 | 0.008 |
4 | 992855 | 0.007 |
4 | 582661 | 0.006 |
2 | 1500000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 488766 | 2 |
0.011 | 740905 | 2 |
0.012 | 1081280 | 4 |
0.013 | 944662 | 2 |
0.015 | 66732 | 1 |
Last trade - 14.30pm 27/09/2024 (20 minute delay) ? |
Featured News
C7A (ASX) Chart |