You are right truthfulword. RED is about to commence construction work to bulk mine on site at KOTH. A final feasibility study for KOTH remains on track for completion in the September quarter 2020 and I'm expecting a positive outcome. PoG has broken resistance @ $1765 with the next target @ $1871.
I loaded up "moar" @ 24c. There is an 8.5c Gap that needs to filled which I think will occur once the "chicken littles" have recovered from the "sky is falling" panic mode.
- Forums
- ASX - By Stock
- RED
- Ann: Operations, production and guidance update
Ann: Operations, production and guidance update, page-56
-
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)