"As of 20 January 2019 the flow rates are consistently in excess of 1,000 standard cubic metres per hour (Sm3) which equates to 8,760,000 Sm3 per year – a twenty-fold increase since the 8 January 2019 announcement of first Syngas quality."
If this was the situation over 3 weeks ago, where are we now? How many standard cubic metres per hour (Sm3), was the target?
From the announcement of commercial quality of Syngas on 08/01 at low flow rates, it was just under 2 weeks til the next Operational Update on 21/01 with x20 increased flow rates - we've now gone as I said over 3 weeks with nothing reported (excluding quarterly report which was a hash of eveything before, and notices of what looks to be a failed rights issue.....).
All I can take from this is that there is an issue, and they are not telling us.
- Forums
- ASX - By Stock
- Ann: Operations Progress Update
"As of 20 January 2019 the flow rates are consistently in excess...
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(11.1%) |
Mkt cap ! $8.684M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $1.063K | 247.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 15457745 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 15986934 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 15207745 | 0.004 |
75 | 82659756 | 0.003 |
61 | 133918953 | 0.002 |
26 | 187150000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 15736934 | 11 |
0.006 | 4995604 | 6 |
0.007 | 1429689 | 3 |
0.008 | 470900 | 3 |
0.009 | 300000 | 1 |
Last trade - 15.16pm 23/08/2024 (20 minute delay) ? |
NRZ (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online