EXR initially showed 200,000cfpd from Nomgon 8 and Nomgon 9 flow test wells, but N8 quickly went off the boil. N8 was shut down and now being used as a monitoring well, it's unfortunately there was a fault line between the 2 wells causing communication/flow problems. New pumps testing on N9 while waiting for N10 to be drilled. Both N9 and N10 being flow tested, albeit with new pumps flows will come on much slower.
Didn't Brendan say flow testing could take up to 12-18 months? These guys are all pioneering CBM in Mongolia; if one succeeds they'll all succeed. If one fails then CBM in Mongolia is done.
- Forums
- ASX - By Stock
- TMK
- Ann: Operations Update - Gurvantes XXXV
Ann: Operations Update - Gurvantes XXXV, page-8
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TMK (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $20.73M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $2.35K | 783.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 73117583 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 74422451 | 36 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
28 | 72817583 | 0.003 |
14 | 20908666 | 0.002 |
9 | 13700999 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 74115551 | 35 |
0.005 | 14117705 | 17 |
0.006 | 3200738 | 5 |
0.007 | 16722080 | 6 |
0.008 | 3037095 | 5 |
Last trade - 15.58pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
0.3¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.3¢ | 0.3¢ | 429290 | ||
Last updated 14.34pm 05/06/2024 ? |
Featured News
TMK (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non-Executive Director
Simon Kidston
Non-Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online