88E 33.3% 0.2¢ 88 energy limited

Not what we wanted to be told, but it is a delay at this time...

  1. 3,076 Posts.
    lightbulb Created with Sketch. 1913
    Not what we wanted to be told, but it is a delay at this time due to weather constraints preventing the work program being continued.

    Its not an abandon, so the JV must be encouraged by the data that they will work out an engineering solution to getting the flow kicked off one way or another.

    Does seem like the formation is unable to expel the 11,000 ft column of frac juice at this stage, and a swab or a gas injection to lift the frac juice was always a possibility.

    Would have been better if the conditions would have permitted this to happen continue now, but it is what it is.

    We have waited patiently....some will wait patiently for the work program to continue next season...some wont.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(33.3%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $36.62K 15.35M

Buyers (Bids)

No. Vol. Price($)
621 874601304 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 509937628 127
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.