88E 25.0% 0.3¢ 88 energy limited

db: Why would the stress profile/high pore pressure make them...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    db:
    Why would the stress profile/high pore pressure make them decide to not bother with the micro-stim?

    --------------

    B'coz reservoir pressure is y'r friend when it comes to flow (ie psi/ft.

    If it was a conventional reservoir u'd look at porosity, perm etc which should b there from the wireline logs.

    Imaging Tool scan of the formation should have given them a good idea of the zones with fractures etc (ie pathways) & the stress profile around the wellbore. These zones r the ones that frac easily (since the matrix is low in clay & reasonably high in silica hence the 'brittleness' - 5 second elevator pitch on Rock mechanics 101) act as pathways for fluid to flowback.

    They've saved a bit of time & money by avoiding the microstim. Pressure data is usually attained from a MDT tool (ie psi/ft) when a fluid sample is collected in a Sample Chamber & then analysed for its GOR, Specific Gravity etc. They haven't reported any GOR yet, so will b interesting to see the final ratio post testing.

    They've also mentioned during IW#1 about Over pressure. So given the depth & matrix of the HRZ which should b same as IW#1, high stress conditions which makes it easy to frac, presence of organic matter & any gas seen during drilling etc, they see reasonably confident about skipping the micro-stim's. So fingers crossed for a safe frac job.

    Next few steps r straight-fwd.

    - They'll get the trucks lined up once a Test interval is selected & all OK is received from AOG,
    - Start pumping the frac fluid (ie xx bbls/minutes) to create the reqd fractures &
    - Shut the well in,
    - Let the pressure buildup,
    - Monitor the pressure on the well head
    - Then come back in a few days & open the well
    - do a flow back thro' a small choke size setting
    - collect all fluids for PVT analysis etc & update mkt about bopd's etc

    Choke sizes for Shale flowbacks r crucial, as u dont want to crank up a 1" diameter (ie 64/64) choke as that will stuff up the reservoir (ie give a rapid decline).

    Norm these days is to go for a 10/64 or 22/64 setting should b optimum, although they'll try all sorts of choke settings & settle for the optimum one to avoid rapid reservoir decline. Hope this helps. GLTA.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $72.33M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $5.805K 2.894M

Buyers (Bids)

No. Vol. Price($)
93 109415193 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 565713746 228
View Market Depth
Last trade - 15.43pm 30/09/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.