    Flowback commenced on the 19th June from stage 2 (upper zone). Approximately 8% of total
    stimulation fluid volume was recovered until it became apparent, due to rate and pressure
    observations, that the upper zone was likely in communication with the lower zone. Consequently, a
    decision was made to drill out the plug between the upper and lower zones. No increase in pressure
    was observed, confirming that the two zones are in effective communication. Trace hydrocarbons
    were encountered whilst flowing back the upper zone prior to drilling out the plug and, as expected,
    the flow rate returned to 100% stimulation fluid once the two zones were flowed back together.

    Flowback, currently comprising 100% stimulation fluid, is continuing. Percentage of fluid recovered
    to date is ~13% of the total fluid pumped. It is estimated that up to 30% of the stimulation fluid will
    need to be recovered before hydrocarbons will be released from the reservoir.

    The forward plan is to monitor pressure and flow rate and continue to draw stimulation fluid off the
    reservoir. Artificial lift, using nitrogen or swab cups, may be introduced at some stage to increase the
    rate of draw down of fluid. If pressure becomes too low it is possible that operations will necessitate
    a shut-in to allow fluid to ‘soak’ and pressure to build up. This ‘soaking’ is not uncommon in other
    shale plays as it allows stimulation fluid to be absorbed into the reservoir and can result in lower
    required fluid flowback before onset of hydrocarbon flow.

    Further updates will be made as and when appropriate throughout the testing program.

    Managing Director, Dave Wall, commented: “We continue to monitor pressure and flowback of
    stimulation fluid whilst we wait for hydrocarbons to be released from the reservoir. Given that we are
    breaking new ground in relation to the HRZ formation, we need to establish the conditions under
    which the hydrocarbon cut will return and then increase.

    The stimulation was executed precisely as per plan with over one million lbs of proppant placed into
    the formation. A little patience is now required as we give the rocks time to show us what they can
    deliver.”
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $8.612K 4.015M

Buyers (Bids)

No. Vol. Price($)
222 341684699 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 609443875 221
View Market Depth
Last trade - 15.56pm 22/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.