Soo,, in November the plant ran 3600 tons at 20 tons an hour, that is running ~ 35 hours a week. Even a 5 day week is only ~ 7 hours a day, I wonder what the need for a second shift is? Still a looong way from what is needed, but at least it is something. It looks like thay are going after the higher grade areas first with the stoping, good, hope the gold is there !!