88E 0.00% 0.2¢ 88 energy limited

Ann: Operations Update, page-156

  1. 9,317 Posts.
    lightbulb Created with Sketch. 1065
    Las, from the 18/6 announcement.

    A production log was run on 12th June and confirmed that all perforations were contributing to flow. As per the flowback design, nitrogen was then introduced gradually to the wellbore from 0845 13th June (AK time), prior to installation of the coiled tube velocity string, to artificially lift stimulation fluids in order to gain connectivity to the reservoir."

    Based on the current rate of fluid recovery the remaining 6% can not be removed based on the numbers available in the 10-14 day window.

    IMHO

    Cheers
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $96.19K 48.09M

Buyers (Bids)

No. Vol. Price($)
1 14125786 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 592032739 228
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.