Las, from the 18/6 announcement.
A production log was run on 12th June and confirmed that all perforations were contributing to flow. As per the flowback design, nitrogen was then introduced gradually to the wellbore from 0845 13th June (AK time), prior to installation of the coiled tube velocity string, to artificially lift stimulation fluids in order to gain connectivity to the reservoir."
Based on the current rate of fluid recovery the remaining 6% can not be removed based on the numbers available in the 10-14 day window.
IMHO
Cheers
- Forums
- ASX - By Stock
- 88E
- Ann: Operations Update
Ann: Operations Update, page-156
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $96.19K | 48.09M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14125786 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 592032739 | 228 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14125786 | 0.002 |
435 | 1184280288 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 570237572 | 222 |
0.004 | 215388401 | 105 |
0.005 | 62178289 | 50 |
0.006 | 33671656 | 33 |
0.007 | 35816299 | 20 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online